Chiba Prefecture and NEXCO East Japan will close the Shisui IC entrance ramp on the Higashi-Kanto Expressway (E51) up-ramp during the night for repair work on the slope.
Closing date and time
Date: November 4-25, 2024, each day from 9:00 p.m. to 6:00 a.m.
Preliminary dates: November 26 – December 17, 2024, each day from 9:00 p.m. to 6:00 a.m.
*Except Saturdays and Sundays
For the detour, the driver is advised to use the Shisui IC – Prefectural Road Tomisato Shisui Route 77 – National Route 296 – National Route 51 – Sakura IC. The turnaround time is expected to be about 15 minutes instead of the usual 5 minutes.
For the latest road traffic information, please check NEXCO East Japan “Doratora”.
© Source travel watch
Auto Amazon Links: No products found.
Auto Amazon Links: No products found.