The Japan International Cooperation Agency (JICA) signed a Grant Agreement (G/A) with the Jordanian government in Amman, the capital of Jordan, on February 23 for the “Water Supply Control System Installation Project in Ma’an Governorate”.
Signing Ceremony
Project Summary
Water Supply Control System Installation Plan in Ma’an Province
The Project for the Introduction of Water Supply Control System in Ma’an Governorate
Country (region covered)
Hashemite Kingdom of Jordan
(Maan City, Maan Province)
Business Objectives
This project will install a SCADA system and upgrade water distribution pumps in the Maan Municipal Water Supply District in Maan Province to establish a real-time, accurate remote monitoring and control of water distribution status and an appropriate operation and management system for water supply facilities, thereby contributing to the improvement of water supply services in the target area.
Business
(a) Facilities and equipment:
Equipment] SCADA system (central remote monitoring and control system, instrumentation equipment and control panels for existing well facilities (25 facilities) and existing water distribution facilities (4 facilities), renewal of water distribution pumps (9 units), etc.
(b) Details of consulting services
Implementation design, bidding assistance, procurement supervision, installation supervision, etc.
Maximum Amount of Provision
1,334 million yen
Scheduled implementation period
36 months (including detailed design and bidding period)
Implementing Agency
Jordan Waterways Authority
Contribution to the achievement of the SDGs
Goal 6 (Safe water and toilets worldwide)
© Source JICA
Auto Amazon Links: No products found.
Auto Amazon Links: No products found.