Keio Corporation will conduct a demonstration test of automatic operation on the Inokashira Line starting in the spring of 2025.
The purpose of the test is to improve the accuracy of the TASC (Traffic Adjustment System for Stationary Stops) in conjunction with the installation of platform doors, as well as to measure the effects of regularity and energy saving. The test results will be used for future automatic operation on the Keio Line.
In this test, the driver only has to operate the train to start, and after the train starts, acceleration and deceleration will be automatically performed except in an emergency, which will be GoA2 level automation. The test will be conducted on a moving train, with both the driver and conductor on board.
© Source travel watch
Auto Amazon Links: No products found.
Auto Amazon Links: No products found.